Project Spotlight: Electrical Panel Upgrade | CellTech

Recently, we were asked to upgrade a solar panel from 100 amps to 200 amps for a major telecom company. Our team conducted a comprehensive site walk prior to the start of the project to ensure client requirements are met and to provide safe, efficient service from start to finish. The team was well prepared and fully equipped for the project, but of course, unexpected challenges can arise. In this case, excessive heat caused a breaker to trip, but our team’s safety protocols and quick thinking ensured power was restored without interruption.

Our team uses Pathwave to document all stages of the project to provide daily filed reports to clients, ensuring transparency and giving peace of mind that the job was completed to their satisfaction.

If you’re looking to upgrade your electrical system, the CellTech team is fully licensed, insured, and equipped to handle the project from start to finish. Trust us to provide you with the

best service possible.

Visit us online at celltechinc.us to learn more, or give us a call at 714.768.0945 to speak with one of our installation professionals today.

CellTech proudly serves Anaheim and all surrounding areas.

Previous
Previous

How To Know It’s Time To Upgrade Your Electrical Panel | CellTech

Next
Next

Project Spotlight: Cupola Extension & Antenna Replacement