Yosemite

AT&T Mobility

CellTech took delivery of prefabricated panels and structural shapes from another concealment manufacturer. The challenge for the client was that no other company wanted to assemble or install the site—not even the manufacturer due to its complexity and as it turned out, other challenges that would arise.

Our client approached us after the site sat in a warehouse for over a year. CellTech answered the challenge to complete the site and pre-assembled the entire water tank structure at our shop. In doing so, several inconsistencies and design issues were brought to light.

CellTech designed solutions and fixes that kept the project on schedule. CellTech took two weeks to pre-assemble the tank and one week on site to install. While on-site it was determined that the water tank did not fit over the planned array configuration and was changed to accommodate the actual water tank design. The client, the carrier and the community were very happy with the way the project turned out.

Previous
Previous

Pepperdine

Next
Next

East Walnut