Pasadena, California • Verizon
CellTech was hired to build eight decorative antenna boxes that would augment the building’s architectural décor, as well as install 60-feet of RF transparent hand railing and more than 40-feet of rooftop screen wall. The site, located in Pasadena, CA, was installed over a 2-day period for the antenna boxes.
In all, the site was installed in less than two weeks. Fabrication began in our warehouse facility where CellTech manufactured the antenna boxes prior to installation onsite. The manufacturing process took approximately 10 days. The boxes are not only RF transparent for antennas, but are microwave transparent as well. This added feature of the CellTech Panel is very useful in developing networks that require back-haul of traffic over existing site networks.